• Head Office - Pakistan

    contact.pak@ajcengg.com
    +92 42 35247133-34

  • Regional Office - Saudi Arabia

    contact.ksa@ajcengg.com
    +966 13 8288365 | +966 13 8288366

Services of PC Contractor for Supply / Installation / Erection / Fabrication / Civil Foundations & Structure /

Services of PC Contractor for Supply / Installation / Erection / Fabrication / Civil Foundations & Structure / Pre-Commissioning / Commissioning & Start Up Assistance of Miscellaneous Equipment/Works for Maru-Reti Compression Project (PC). Client: Oil & Gas Development Company Limited. Scope of Work: Services of PC Contractor for Supply / Installation / Erection / Fabrication[...]

Read More
Construction of Civil Works of entire factory and Fabrication, Erection, Installation and commissioning of complete lubricant plant at Chak Pirana, Lala Musa.

Construction of Civil Works of entire factory and Fabrication, Erection, Installation and commissioning of complete lubricant plant at Chak Pirana, Lala Musa. Client: Gizri Lubricants Pvt. Ltd. Karachi. Scope of Work: Construction of Civil Works of entire factory and Fabrication, Erection, Installation and commissioning of complete lubricant plant at Chak Pirana, Lala Musa. Completion Year:[...]

Read More
Construction of sand foundation pad and fabricating, erecting, commissioning 0f 04 Nos Molasses steel tanks at FSM, Sangla Hill and FSM, Khoski.as per API- 650 Standers.

Construction of sand foundation pad and fabricating, erecting, commissioning 0f 04 Nos Molasses steel tanks at FSM, Sangla Hill and FSM, Khoski.as per API- 650 Standers. Client: Fauji Foundation, Rawalpindi. Scope of Work: Construction of sand foundation pad and fabricating, erecting, commissioning 0f 04 Nos Molasses steel tanks at FSM, Sangla Hill and FSM, Khoski.as[...]

Read More
1-Fabrication, Erection, Installation of vertical steel tanks for furnace oil of 100’ dia x 42’ H x 5 Nos. alongwith piping boiler, compressors, heat exchangers, pumping unit and railway wagon decanting system at F. O. Terminal Mahmood Kot Distt: Muzaffar Garh.

1-Fabrication, Erection, Installation of vertical steel tanks for furnace oil of 100’ dia x 42’ H x 5 Nos. alongwith piping boiler, compressors, heat exchangers, pumping unit and railway wagon decanting system at F. O. Terminal Mahmood Kot Distt: Muzaffar Garh. Client: Pakistan State Oil Co Ltd. Karachi. Scope of Work: 1-Fabrication, Erection, Installation of[...]

Read More
Fabrication of local machinery on LMM loan scheme through IDBP. Erection and commissioning of imported machinery including entire piping at Chunian industrial Estate Bhai Pheru.

Fabrication of local machinery on LMM loan scheme through IDBP. Erection and commissioning of imported machinery including entire piping at Chunian industrial Estate Bhai Pheru. Client: M/s Rex Baren Battries Ltd, Fortress Stadium, Lahore. Scope of Work: Fabrication of local machinery on LMM loan scheme through IDBP. Erection and commissioning of imported machinery including entire[...]

Read More
Fabricating, Installing, testing and Commissioning of Polyester Plant Piping.

Fabricating, Installing, testing and Commissioning of Polyester Plant Piping. Client: Spintex Limited. Mirpur Azad Kashnir Scope of Work: Fabricating, Installing, testing and Commissioning of Polyester Plant Piping. Completion Year: 1992 Contract Value in Million Rs. 2.5

Read More
1-Fabricating, erecting and installing horizontal underground tanks and piping network for oil products and fire fighting system as per API-1104 standards at Bulk oil storage depot, Lahore, Rawalpindi, Sargodha, Bahawalpur, Peshawar.

1-Fabricating, erecting and installing horizontal underground tanks and piping network for oil products and fire fighting system as per API-1104 standards at Bulk oil storage depot, Lahore, Rawalpindi, Sargodha, Bahawalpur, Peshawar. Client: Caltex Oil (Pakistan) Ltd, Karachi. Scope of Work: 1-Fabricating, erecting and installing horizontal underground tanks and piping network for oil products and fire[...]

Read More
Mechanical works for 5.5 MW Power Plant at Nagina Textile Mill Ltd (Aminabad ,Distt. Kotri), Ellcot Spinning Mills Ltd.

Mechanical works for 5.5 MW Power Plant at Nagina Textile Mill Ltd (Aminabad ,Distt. Kotri), Ellcot Spinning Mills Ltd. Client: Ellahi Electric Co. Ltd, Nagina House, 9-B-I M.M Alam Road,Gulberg-III, Lahore Scope of Work: Mechanical works for 5.5 MW Power Plant at Nagina Textile Mill Ltd (Aminabad ,Distt. Kotri), Ellcot Spinning Mills Ltd. (Manga Raiwind[...]

Read More
Mechanical works for 9.5 MW Power Plant at Crescent Powertec Ltd. Comprising upon installing of plant, machinery & equipment along with auxiliaries including fabricating and installation of Plant piping of carbon steel, stainless steel, copper and PVC piping

Mechanical works for 9.5 MW Power Plant at Crescent Powertec Ltd. Comprising upon installing of plant, machinery & equipment along with auxiliaries including fabricating and installation of Plant piping of carbon steel, stainless steel, copper and PVC piping Client: Crescent Powertec Ltd. 7-B-III, Aziz Avenue,Gulberg-V,Lahore. Scope of Work: Mechanical works for 9.5 MW Power Plant[...]

Read More
1-Fabrication, erection of MEG tanks as per API-650 stander having 10,000 MT capacities dully sand blasting and epoxy painted internal at port Bib Qusam, Karachi. Fuel oil storage tanks as per API- 650 Standers capacity 15000 MT at industrial. Hatter

1-Fabrication, erection of MEG tanks as per API-650 stander having 10,000 MT capacities dully sand blasting and epoxy painted internal at port Bib Qusam, Karachi. Fuel oil storage tanks as per API- 650 Standers capacity 15000 MT at industrial. Hatter Client: Dhan Fibres Ltd.1/4, 3rd Floor, Usman Block, Awami Complex, New Garden Town, Lahore. Scope[...]

Read More

Recent Comments

    Archives