PAPCO (Pak Arab Pipeline Company) / PDIL
Fabrication & Erection of Field Storage Tanks as per Applicable Standard API 650 at Mehmood Kot Terminal for PAPCO’S White Oil Pipeline Project.
PAPCO’S White Oil Pipeline Project.
1. MOGAS Storage Tanks (5Nos)
Fixed column supported roof +Internal floating
Dia = 55.50 m. x Ht. 14.63 m. each Tank.
2. MOGAS Day Tank (1No)
Fixed column supported roof +Internal floating Dia = 15.00 m. x Ht. 9.00 m.
3. MOGAS Slope Tank (1No)
Fixed column supported roof +Internal floating Dia = 9.15 m. x Ht. 6.00 m.
4. HSD Day Tank (1No)
Column supported with Fixed cone roof Dia = 15.00 m. x Ht. 9.00 m.
5. Trans Mix Storage Tank (2Nos)
Fixed column supported roof +Inzternal floating Dia = 20.80 m. x Ht. 14.63 m. each Tank.
6. FUEL Oil Tank (2Nos)
Self supported
Dia = 4.50 m. x Ht. 7.20 m. each Tank
7. FIRE Water Tank (1No)
Fixed cone, column supported
2019